OBJECT CHARACTERISTICS:

Total design capacity: 5.5 MW

IT racks: 440 

 

Specific features of the facility:

  • The data center will be certified by Uptime Institute as Tier III fault tolerance level
  • The project includes the construction of an administrative building and a technological part of the data center with a capacity of 440 IT racks with a power of 7 kW each
  • Own operation service 24/7