Key Point group data center in Saint Petersburg

Data Centers
In Progress

OBJECT CHARACTERISTICS:

Total design capacity: 20 MW

IT racks: 1650 

 

Specific features of the facility:

  • The data center will be certified by Uptime Institute as Tier IV fault tolerance level
  • The project will be implemented using in 3 stages:
    • 1 st stage includes office and amenity building and a technological part of the data center with a capacity of 330 IT racks with a power of 7 kW each
    • 2 nd and 3 rd stages include the technological part of the data center with a total capacity of 1,320 IT racks with a power of 7 kW each
  • Own operation service 24/7
  • Commissioning of the 1 st stage is planned for 2025
  • Commissioning of the 2 nd and 3rd stages is planned for 2026