Key Point group data center in Saint Petersburg
Data CentersIn Progress
OBJECT CHARACTERISTICS:
Total design capacity: 20 MW
IT racks: 1650
Specific features of the facility:
- The data center will be certified by Uptime Institute as Tier IV fault tolerance level
- The project will be implemented using in 3 stages:
- 1 st stage includes office and amenity building and a technological part of the data center with a capacity of 330 IT racks with a power of 7 kW each
- 2 nd and 3 rd stages include the technological part of the data center with a total capacity of 1,320 IT racks with a power of 7 kW each
- Own operation service 24/7
- Commissioning of the 1 st stage is planned for 2025
- Commissioning of the 2 nd and 3rd stages is planned for 2026